Low CO2 Emissions
FireCrunch cladding chosen for Govt. RAAF personnel accommodation units Sydney
These units are the first of a new high-speed steel-framed pre-fabricated modular accommodation production system for the RAAF in Sydney. This new construction system has lowered costs and speeded up output. FireCrunch single 10mm K-Clad sheets afforded both FRL 90 90/90 and assisted the acoustic well over plasterboard and at 50% of the normal fire wall cost in 50% less product, 50% less freight cost, 50% less crane up, 50% less site labour handling all helping increasing ROI and deadlines. The hardwearing and extra strong hi-density FireCrunch K-Clad 1.15g/m3 Magnesium Oxide Sulphate ( MgSO4) cladding, means long term, very low maintenance, being [...]
Royal Australian Navy installs FireCrunch K-Floor TG 19 at Garden Island Naval Base
Low net CO2 11.9 kg/m2 CFC products vs FireCrunch 0.60 kg/m2 95% less The Garden Island, RAN naval base is now fitted out with specific areas requiring fire rated flooring systems and chose FireCrunch products to meet the requirement as FCA is NATA Labs CSIRO tested to AS1530-4 Australian Standards. Installed by Brighton Construction NSW, this is one of many Government projects where FireCrunch has been selected for high fire performance, stability, density and high screw pull through requirements 7.9 kN. Other benefits are in water proofing and flood resistance where FireCrunch is an inert non-organic material, which termites cannot [...]
Charles Sturt University awards FireCrunch the cladding supply contract for fire walls in its latest university development
Stage 2 of the Charles Sturt student accommodation units on campus Port Macquarie NSW FireCrunch Australasia Pty Ltd commences supply of its products selected again for Stage 2 of the Charles Sturt student accommodation units on campus Port Macquarie NSW. The install building contractor is Elicorp Pty Ltd Qld, in supply partnership with FireCrunch Australasia PL. Stage 1 was completed in 2022 and the 2nd stage is now underway with completion later in 2023. FireCrunch was chosen, apart from it’s NATA labs CSIRO fire tested protection capabilities, but also for the low 5% CO2 emissions in manufacturing, in line with [...]