Government
FireCrunch cladding chosen for Govt. RAAF personnel accommodation units Sydney
These units are the first of a new high-speed steel-framed pre-fabricated modular accommodation production system for the RAAF in Sydney. This new construction system has lowered costs and speeded up output. FireCrunch single 10mm K-Clad sheets afforded both FRL 90 90/90 and assisted the acoustic well over plasterboard and at 50% of the normal fire wall cost in 50% less product, 50% less freight cost, 50% less crane up, 50% less site labour handling all helping increasing ROI and deadlines. The hardwearing and extra strong hi-density FireCrunch K-Clad 1.15g/m3 Magnesium Oxide Sulphate ( MgSO4) cladding, means long term, very low maintenance, being [...]
Royal Australian Navy installs FireCrunch K-Floor TG 19 at Garden Island Naval Base
Low net CO2 11.9 kg/m2 CFC products vs FireCrunch 0.60 kg/m2 95% less The Garden Island, RAN naval base is now fitted out with specific areas requiring fire rated flooring systems and chose FireCrunch products to meet the requirement as FCA is NATA Labs CSIRO tested to AS1530-4 Australian Standards. Installed by Brighton Construction NSW, this is one of many Government projects where FireCrunch has been selected for high fire performance, stability, density and high screw pull through requirements 7.9 kN. Other benefits are in water proofing and flood resistance where FireCrunch is an inert non-organic material, which termites cannot [...]